On Wednesday and Thursday of this week the glazing around the main entrance and the entrance below it on the ground floor is being replaced.  This means that both entrances will be out of use.  If you need to enter the Main Building, you must use the entrances at the back.

If you come to college on foot or by bus, please use the Annex Gate and walk along the roadway between the theatre and IT Block to reach the back entrance of the Main Building.  You must not walk through the building site.